ARTESYN, Tatabánya USA 2001 12.000m 2 > 2000 2+7 months electronicc manufacturing office building for financial department, 2-storey storage and complete design (studies-permission-details) production hall complete project management and supervision ZENONN Systems, Tatabánya CAN 1998 850 m2 > 140 2+6 months leading water treatment company complete cesign (studies-permission-details) assemblement fabric with warehousee and office building complete project management and supervision
GENERAL ELECTRIC ZENON Europe, Oroszlány USA CAN leading water treatment company I. Phase.: greenfield production hall and office building II. Phase: extension of offices and production hall III. Phase.: extension with medical production 2001-2008 22.000m 2 > 4000 2+6 months complete cesign (studies-permission-details) complete project management and supervision GENERAL ELECTRIC CAN/ ZENON Europe and OSZRT /USA Oroszlány wastewater treatment plant function also representative plant II. phase: extension with a 4.500 m3 pool 2005-2006 2007-900 m2 > 2002 2+6 months monolithical concrete construction complete cesign (studies-permission-details) complete project management and supervision
BECOM Electronics, I.&II. phase, Környe electronicc manufacturing and east-european headquarter The Industrial Building of the Year 2007 (Kingspann I. Prize) A 2006, 2011 1200 m2 > 4004 1+6 months 2400 m2 steel-construction complete Design (studies-permission-details) off-site Management MCI, Vértesszőlős NL heavy vehicle trade center and service station hungariann headquarterr 2001 1200m2 > 180 2+6 months complete design (studies-permission-details) complete project management and supervision
PIONEER I-BRED, Szarvas USA 1996-11.000m 2 > 9009 2+6 months agricultural corn-fabric with cold-warehouses, dryers, conveyors complete design (studies-permission-details) PEPSI Co. refreshing drinks bottling plants for ungary and Slowakia distribution and logistic centers USA 1994-15.000m 2 > 1800 2 + 4-6 months complete design (studies-permission-details)
BORGWARNER Turbo- Systems, Oroszlány D/USA leading automotive company (turbo chargers) c I.Phase: production hall and office building II. Phase: production hall and office building III. Phase: emulsion tank and warehouse 2001-9000 m2 > 1500 2+8 months complete design (studies-permission-details) complete project management and supervision BORGWARNER Turbo Systems, Oroszlány D/USA leading automotive company (turbo-chargers) IV. Phase: new financial office and production halll 2007 5000 m2 > 7507 2+7 months complete design (studies-permission-details) complete project management and supervision
FLEXTRONICS (NATSTEEL), Budapest electronicc manufacturing new production halls and warehouses extensionn of halls D 2003 24.000m 2 > 2500 2+7 months complete design (studies-permission-details) project management and supervision BEBUSC, Oroszlány D 1999 1700 m2 > 2002 2+6 months automotive production hall and office building NOKIA Audio, Székesfehérvár automotive production hall and office building (now artmann) ) D supervision 1997 3300 m2 > 4504 2+6 months steel construction complete design (Studies-Permission-Details) IMPREGLON, Tatabánya automotive, coating technologies II., III., IV., V. phases: extension of production halls and warehouses D 2004, 2006, 2007, 2011 1850 m2 > 150 2+6 months complete design (studies-permission-details)
J.. ZIEGLER EERC, Bábolna automotive and furniture industry (non-wovens) East-European Regional Center office, production and warehouse D 2005-2006 2700 m2 > 3503 2+6 months complete design (studies-permission-details) complete project management and supervision J.. ZIEGLER EERC, Bábolna automotive and furniture industry (non-wovens) extensionn of production hall and warehouses (III. phase under developement) D 2011-2700 m2 > 4504 2+6 months complete design (studies-permission-details) complete project management and supervision
Wellnet International, Tataa 2007 1200 m2 > 150 2 months medical technologies Office building production with warehouse complete design (studies-permission-details) BD, TATABÁNYAA F 2011 > 2002 Project time: (supervision) 6 months medical technology company extensionn of production ares (with clean-spaces) complete supervision
WGS Stamping Kft, Szántód, A automotive, stell pressing office building production hall and warehouse 2008-1.400 m2 300 3+6 months complete design (studies-permission-details) complete project management and supervision PETER-LACKE, Pákozd D 2008- automotive, household and electronics (paint systems) east-european center offices, production and warehouse 2400 700 - complete design (studies-permission-tender) complete project management
RÉN Spedex Kft. Tatabánya production hall with offices and social block 2011-1000 m2 180 3 months steel construction complete design (studies-permission-details) Logistics hall, Oroszlány new intermodial logistic center in industrial park off Oroszlány (running project) 2011-10.000 m2 > 1000 design (studies-permission) project management 1 months
BORGWARNER Turbo Systems, Oroszlány D/USA 2011-4000 m2 > 8008 2 months leading automotive company (turbo-chargers) V. Phase: new headquerter office and production hall complete design (studies-permission-details) (under complete project management and supervision
AVE Magyarország D / 2012-2000 m2 > 1.000 2 months biogas power plant (under design (execituion plans) complete technical supervision MAART-LOG, Tata logistic hall and truck service (running project) Project time: (design) 2012 1500 m2 > 4004 2months complete design (studies-permission)
FCI (DELPI) D / 2012-8000 m2 > 1.000 7 months automotive cable plant extension (under complete technical supervision MTF Tiszalök, Keszthely, Mezőtúr 2013 1500 m2 > 4004 Project time: (design) 3months service halls, (incubator houses) (running project) complete design (studies-permission-execution plans)
PANNON LÉZER, Tata steel machining with laser technologie II. phase: new headbuilding and production hall (under 2012 2000 m2 > 4004 2months complete design (studies-permission-ex.plans) BECOM Projekt Electronics Austria Gmb Nation. A Datum Fläche KostenK 2013 2000 m2 > 4004 Period 2 Monate electronicc company office haedquarter and labors complete design (studies-permission-construczion plans)
References RESIDENTIAL & PUBLIC BUILDINGS AND PROJECT MANAGE EMENTT Planbau Kft Tatabánya 1/12 nyomtatva: 2013.06.04.
LAKE SIDE Lakópark CAN/ Társasház, 58 lakásos I. ütem: A, B épületek, felül kétszintes lakásokkal 2005-850 m2 > 6006 2+8 hónap Monolit vasbeton és téglafalazat Feladatunk volt: előkészítés,, komplett tervezés, project management, műszaki ellenőrzés LAKE SIDE Lakópark 2007- - > 6006 2 hónap Társasház, II. ütem: C, D épületek, felül kétszintes lakásokkal Monolit vasbeton és téglafalazat Jelenleg vázlattervezés, előkészítés alatt. Planbau Kft Tatabánya 2/12 nyomtatva: 2013.06.04.
The New Face of Kaluga A/RUS 2007- - - - Városfejlesztés Lakóépületek, irodaépületek, szálloda és bevásárlóközpont Vázlattervek éss prezentációss anyag UNGER Internationalnak KALUGA TOWER 2007- - > 2 Mrd - 18 szintess iroda és hotel épület alatta kétszintes mélygarázs Monolit vasbeton és acélszerkezet Tervezés alatt Planbau Kft Tatabánya 3/12 nyomtatva: 2013.06.04.
Árpád Tömb Győr A/RUS Győr belvárosában üzlet és társasház tervezése mélygarázzsal 2008- - > 6006 Mio - Monolit vasbeton vázas szerkezetű épülett Feladatunk: Vázlat, építési engedélyezési és kiviteli tervdokumentáció készítése FŐ TÉRI ÜZLETÁZ TATABÁNYA Iroda és üzletház Tatabánya belvárosában 2007- - > 6006 - Monolit vasbeton vázszerkezetű épület mélygarázzsal Tervezés alatt Planbau Kft Tatabánya 4/12 nyomtatva: 2013.06.04.
Vértes Agóra, Tatabánya Közművelődés áza átalakítása és bővítése multifunkcionális központtá 2009-3.000 m2 > 1 Mrd - Vázlattervek, engedélyezési tervezés, kiviteli tervek készítése Feszty-udvar és Vackor Óvoda, Környe 2009-2.000 m2 > 3003 - Feszty-udvar és környezetének rendezése valamint 9 Nyertes pályázat, vázlattervezés, engedélyezési csoportoss óvoda és bölcsőde tervezése tervezés Planbau Kft Tatabánya 5/12 nyomtatva: 2013.06.04.
Sárberki Általános Iskola,, Tatabánya 2009-4.500 m2 > 3003 2 hónap Általános Iskola átalakítása, bővítése és teljeskörűű Vázlattervek, engedélyezési tervezés és kiviteli k tervek akadálymentesítése készítése Óvoda, Vértessomló 2009-800 m2 > 100 1 hónap 3 csoportos óvoda tervezése Vázlattervek, engedélyezési tervezés készítése Planbau Kft Tatabánya 6/12 nyomtatva: 2013.06.04.
Fő tér rendezés, Sárbogárd 2008-1 hónap Művelődési ház és Polgármesteri ivatal felújításaa Vázlattervek készítése Turul mozi, Tatabánya 2008-1 hónap Meglévő mozi épület lakóépületté való átépítése Vázlattervek készítése Planbau Kft Tatabánya 7/12 nyomtatva: 2013.06.04.
Panoráma Lakópark, Tatabánya 2009-2 hónap 6 lakásból álló társasházak Vázlattervek, engedélyezési tervezés készítése Passzívház, Budapest 2009-230 m2 > 404 1 hónap Lakóépület passzívházként minősítve Vázlattervek, engedélyezési tervezés és kiviteli k tervek készítése Planbau Kft Tatabánya 8/12 nyomtatva: 2013.06.04.
Sportcsarnok, Türkmenisztán TÜ Sportcsarnok típustervek kidolgozása 3 méretben (Tervezés) 2009-8200 m2 > 8008 2 hónap Vázlattervek, engedélyezési tervezés készítése folyamatban Sportcsarnok, Türkmenisztán Multifunkcionális csarnok TÜ (Tervezés) 2009-8200 m2 > 8008 2 hónap Vázlattervek, engedélyezési tervezés készítése folyamatban Planbau Kft Tatabánya 9/12 nyomtatva: 2013.06.04.
Fő tér rendezés, Tatabánya 2008-1 hónap Ötletpályázat Samufalvi Óvoda, Vértesszőlős 2010-3 hónap + Új Óvoda épület Engedélyezési és kiviteli tervek Planbau Kft Tatabánya 10/12 nyomtatva: 2013.06.04.
IT Gyülekezete, Tatabánya 2010-3 hónap + Gyülekezeti épület Engedélyezési és Kiviteli tervek Üzletház Oroszlány 2008-3 hónap Új üzlet és lakóépület Engedélyezési és kiviteli tervv Planbau Kft Tatabánya 11/12 nyomtatva: 2013.06.04.
Árpád tömb 2012-3 hónap + Lakóparkk mélygarázzsal, Győr belváros Engedélyezési és Kiviteli tervek Agostyán lakópark /NL 2012-3 hónap Családi házas lakóparkk Engedélyezési és kiviteli tervv Planbau Kft Tatabánya 12/12 nyomtatva: 2013.06.04.